Go to Top The Under Frame is Laid for the Log Cabin

Posted: 20 August 2020

Today saw the first step in the installation of the long awaited log cabin.

Log Cabin Base

Piles were driven 6ft into the ground. They were topped with paving slabs and then the base frames were bolted together and levelled. The job was really quite quick. This photo was taken just after 15:00 and the team had already left the site.